The ACCIONA San Roman Wind Farm is a 93-MW project located in Cameron County, Texas. This wind farm features thirty-one 3MW wind turbines, and roads constructed by Foremost Paving connect to every turbine. The wind farm can power 30,000 homes, and access to each turbine is quick and reliable with the network of roads built by Foremost Paving.