Our Work

HCID #1 Canal Lining Project

Client:
Hidalgo County Irrigation District #1
Prime Contractor:
Location:
McAllen, TX

The project consists of replacing the existing earthen canal with a concrete lined canal.  The liner is made up of geosynthetic material and 4,000 psi concrete with fiber. 

The Project includes all-in-one controlled slip meter gates that can function at high and low flow rates. The gates are designed to combine canal water flow measurement and precision flow control. The fully integrated system is solar powered and includes radio telecommunication to provide accurate real-time information. 

No items found.